Time And Cost Controlling Using Critical Path Method (Case Study At Palur Fly-Over Surakarta)

ABSTRACT-The purpose of this study is to (1.To analyze the remaining work items at month of 14th from the project starts, 2). To analyze the remaining cost items at month of 14th after the project start. And the last is 3). To reschedule and to optimize the time and cost by use Critical Path Method...