Analisis Gangguan Hubung Singkat Pada Sistem Tenaga Listrik Di KSO Pertamina EP - GEO Cepu Indonesia Distrik 1 Kawengan Menggunakan Software ETAP 12.6

Study of short circuit is important in planning the manufacture of electric power systems. Short circuit occurs when the phase conductor is connected directly to the neutral conductor. Because no such resistance electrical appliancesvthus the short circuit current flow is proufoundly big. To mitigat...

Full description

Saved in:
Bibliographic Details
Main Authors: Saputra, Very Bagus (Author), , Ir. Jatmiko, M.T (Author)
Format: Book
Published: 2016-04-27.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Connect to this object online

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available