Analisis Gangguan Hubung Singkat Pada Sistem Tenaga Listrik Di KSO Pertamina EP - GEO Cepu Indonesia Distrik 1 Kawengan Menggunakan Software ETAP 12.6
Study of short circuit is important in planning the manufacture of electric power systems. Short circuit occurs when the phase conductor is connected directly to the neutral conductor. Because no such resistance electrical appliancesvthus the short circuit current flow is proufoundly big. To mitigat...
Saved in:
Main Authors: | Saputra, Very Bagus (Author), , Ir. Jatmiko, M.T (Author) |
---|---|
Format: | Book |
Published: |
2016-04-27.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analisa Gangguan Hubung Singkat pada Sistem Tenaga Listrik di Pertamina EP-Central Processing Plant Area Gundih Menggunakan Software ETAP 12.6
by: Ernia, Ana Dwi, et al.
Published: (2017) -
Studi Analisis Gangguan Hubung Singkat Jaringan Transmisi GI Jajar-Gondangrejo-Palur Menggunakan ETAP 12.6
by: Pratama, Yaniar Nur Ihsan, et al.
Published: (2017) -
Analisa Waktu Kerja Rele Arus Lebih Terhadap Letak Gangguan Hubung Singkat Dengan Menggunakan Software ETAP 12.6
by: Palagan, Yudha, et al.
Published: (2016) -
ANALISIS GANGGUAN HUBUNG SINGKAT PENYULANG JAJAR01 MENGGUNAKAN SOFTWARE ETAP
by: AZIS, MOHAMMAD WAHYU
Published: (2011) -
ANALISIS GANGGUAN HUBUNG SINGKAT PADA SISTEM TENAGA LISTRIK DI PT. PERTAMINA REFINERY UNIT (RU) VI BALONGAN MENGGUNAKAN SOFTWARE ETAP 7.5.0
by: Destiani, Puspa Lita
Published: (2014)