Prarancangan Pabrik Asam Sulfat dari Sulfur dan Udara Kapasitas 325.000 ton/tahun
Sulfuric acid plant raw material with sulfur and air capacity of 325,000 tons/year it is planned to operate for 330 days/year. Products of sulfuric acid (98%) produced as much as 41,035.3535 kg/hour of need as much sulfur raw materials 13,218.9274 kg\/h and air dry as much as 84,905.6490 kg/h. Suppo...
Saved in:
Main Authors: | Tria Okti Anggraini, Devi (Author), , Tri Widayatno, S. T., M. Sc., Ph. D. (Author), , Ir. Nur Hidayati, M.T., Ph.D (Author) |
---|---|
Format: | Book |
Published: |
2016.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Prarancangan Pabrik Nitrobenzena Dari Benzena Dan Asam Campur Dengan Proses Batch Kapasitas 325.000 Ton/Tahun
by: Idrus, Mgs. Ahmad, et al.
Published: (2016) -
Prarancangan Pabrik Asam Sulfat dari Sulfur dan Udara Kapasitas 310.000 Ton/Tahun
by: Annas, Muhammad Khoirun, et al.
Published: (2016) -
Prarancangan Pabrik Asam Lemak Dari Minyak Kelapa SawitKapasitas 70.000 Ton/Tahun
by: Widiana, Novita, et al.
Published: (2014) -
Prarancangan Pabrik Asam Lemak Dari Minyak Kelapa SawitKapasitas 65.000 Ton/Tahun
by: Lestari, Diyah Eka, et al.
Published: (2014) -
Prarancangan Pabrik Asam Akrilat Dengan Proses Oksidasi Propylene Kapasitas 28.000 Ton/Tahun
by: Dwitanti, Rika, et al.
Published: (2014)