Prarancangan Pabrik Asam Sulfat dari Sulfur dan Udara Kapasitas 325.000 ton/tahun

Sulfuric acid plant raw material with sulfur and air capacity of 325,000 tons/year it is planned to operate for 330 days/year. Products of sulfuric acid (98%) produced as much as 41,035.3535 kg/hour of need as much sulfur raw materials 13,218.9274 kg\/h and air dry as much as 84,905.6490 kg/h. Suppo...

Full description

Saved in:
Bibliographic Details
Main Authors: Tria Okti Anggraini, Devi (Author), , Tri Widayatno, S. T., M. Sc., Ph. D. (Author), , Ir. Nur Hidayati, M.T., Ph.D (Author)
Format: Book
Published: 2016.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Connect to this object online

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available