Prarancangan Pabrik Asam Sulfat dari Sulfur dan Udara Kapasitas 325.000 ton/tahun
Sulfuric acid plant raw material with sulfur and air capacity of 325,000 tons/year it is planned to operate for 330 days/year. Products of sulfuric acid (98%) produced as much as 41,035.3535 kg/hour of need as much sulfur raw materials 13,218.9274 kg\/h and air dry as much as 84,905.6490 kg/h. Suppo...
Saved in:
Main Authors: | , , |
---|---|
Format: | Book |
Published: |
2016.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Connect to this object online3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |