Prarancangan Pabrik Asam Sulfat dari Sulfur dan Udara Kapasitas 325.000 ton/tahun
Sulfuric acid plant raw material with sulfur and air capacity of 325,000 tons/year it is planned to operate for 330 days/year. Products of sulfuric acid (98%) produced as much as 41,035.3535 kg/hour of need as much sulfur raw materials 13,218.9274 kg\/h and air dry as much as 84,905.6490 kg/h. Suppo...
में बचाया:
मुख्य लेखकों: | , , |
---|---|
स्वरूप: | पुस्तक |
प्रकाशित: |
2016.
|
विषय: | |
ऑनलाइन पहुंच: | Connect to this object online |
टैग: |
टैग जोड़ें
कोई टैग नहीं, इस रिकॉर्ड को टैग करने वाले पहले व्यक्ति बनें!
|
इंटरनेट
Connect to this object online3rd Floor Main Library
बोधानक: |
A1234.567 |
---|---|
प्रति 1 | उपलब्ध |