Prarancangan Pabrik Asam Sulfat dari Sulfur dan Udara Kapasitas 325.000 ton/tahun
Sulfuric acid plant raw material with sulfur and air capacity of 325,000 tons/year it is planned to operate for 330 days/year. Products of sulfuric acid (98%) produced as much as 41,035.3535 kg/hour of need as much sulfur raw materials 13,218.9274 kg\/h and air dry as much as 84,905.6490 kg/h. Suppo...
Bewaard in:
Hoofdauteurs: | , , |
---|---|
Formaat: | Boek |
Gepubliceerd in: |
2016.
|
Onderwerpen: | |
Online toegang: | Connect to this object online |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Wees de eerste die reageert!