Prarancangan Pabrik Sodium Silikat Dari Natrium Hidroksida Dan Pasir Silika Kapasitas Produksi 60.000 Ton/Tahun
Sodium silicate factory with raw material sodium hydroxide and silica sand, the production capacity of 60.000 tons per year is planned to operate for 330 days per year. This factory will be established in an industrial area Gresik, East Java, with a land area of 12,168 m2 and the number of employees...
Bewaard in:
Hoofdauteurs: | , , |
---|---|
Formaat: | Boek |
Gepubliceerd in: |
2016.
|
Onderwerpen: | |
Online toegang: | Connect to this object online |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Internet
Connect to this object online3rd Floor Main Library
Plaatsingsnummer: |
A1234.567 |
---|---|
Kopie 1 | Beschikbaar |