Prarancangan Pabrik Metanol Dari Batubara Dengan Proses Gasifikasi Kapasitas Produksi 100.000 Ton/Tahun

Methanol plant with raw material from gas synthesis of coal capacity 100.000 ton/years operated 330 days per years. Methanol manufactured process using fixed bed reactor. Reaction on fixed bed reactor occur gas phase, and exothermic, with operation condition non adiabatic at temperatur 2000C and pre...

Ful tanımlama

Kaydedildi:
Detaylı Bibliyografya
Asıl Yazarlar: Asokawati, Anggie Fatimah (Yazar), , Kusmiyati, S.T., M.T., Ph.D (Yazar), , M. Mujiburohman, S.T., M.T., Ph.D (Yazar)
Materyal Türü: Kitap
Baskı/Yayın Bilgisi: 2016.
Konular:
Online Erişim:Connect to this object online
Etiketler: Etiketle
Etiket eklenmemiş, İlk siz ekleyin!

Internet

Connect to this object online

3rd Floor Main Library

Detaylı Erişim Bilgileri 3rd Floor Main Library
Yer Numarası: A1234.567
Kopya Bilgisi 1 Kütüphanede