Perancangan Koordinasi Proteksi Di Pt PertaminaEp-Central Processing Plant Area Gundih
Damages on the electrical loads and distribution equipments often occur due to disturbances. Disorders can be result from internal or external factors. One disorders that often occurs is short circuit. Isolating the fault need arotection equipment, namely overcurrent relay. In the application, to ge...
Saved in:
Main Authors: | Ariyanta, Riki (Author), , Aris Budiman, S.T., M.T (Author) |
---|---|
Format: | Book |
Published: |
2017.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analisis Dan Perancangan Koordinasi Sistem Proteksi Rele Arus Lebih Di Pusat Penampungan Produksi Menggung Pertamina Asset Iv Field Cepu
by: Nugraha, Dio Putra, et al.
Published: (2017) -
Analisa Pengaruh Pemasangan Distributed Generation Pada Jaringan Listrik di Pertamina Ep-Central Processing Plant Area Gundih Menggunakan Software Etap 12.6
by: , Yunitasari, et al.
Published: (2017) -
Analisa Gangguan Hubung Singkat pada Sistem Tenaga Listrik di Pertamina EP-Central Processing Plant Area Gundih Menggunakan Software ETAP 12.6
by: Ernia, Ana Dwi, et al.
Published: (2017) -
Analisis Perencanaan Koordinasi Sistem Proteksi Relay Arus Lebih Pada Jaringan Distribusi Tenaga Listrik Di Pusdiklat Migas Cepu
by: Bariq, Julda Faisal, et al.
Published: (2016) -
APLIKASI RESERVASI MEETING ROOM BERBASIS WEB(STUDI KASUS: PT PERTAMINA EP
by: Mohammad Faudzan Azizun Hakim,
Published: (2021)