Prarancangan Pabrik Etanolamin Dari Etilen Oksida Dan AmoniakKapasitas 114.000 Ton/Tahun
Ethanolamine factory with raw materials of ethylene oxide and ammonia is planned to be established at industrial zones in Cilegon, Banten, with a production capacity of 114,000 tonnes/year by 2020. The production of ethanolamine is carried out in a plug flow reactor operatednon-isothermally. Thermod...
Saved in:
Main Authors: | , , |
---|---|
Format: | Book |
Published: |
2017.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Connect to this object online3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |