Prarancangan Pabrik Etanolamin Dari Etilen Oksida Dan AmoniakKapasitas 114.000 Ton/Tahun
Ethanolamine factory with raw materials of ethylene oxide and ammonia is planned to be established at industrial zones in Cilegon, Banten, with a production capacity of 114,000 tonnes/year by 2020. The production of ethanolamine is carried out in a plug flow reactor operatednon-isothermally. Thermod...
Furkejuvvon:
Váldodahkkit: | Nugroho, Yunianto Tri (Dahkki), , Muhammad Mujiburohman, S.T., M.T., Ph.D (Dahkki), , Ir. Nur Hidayati, M.T., Ph.D (Dahkki) |
---|---|
Materiálatiipa: | Girji |
Almmustuhtton: |
2017.
|
Fáttát: | |
Liŋkkat: | Connect to this object online |
Fáddágilkorat: |
Lasit fáddágilkoriid
Eai fáddágilkorat, Lasit vuosttaš fáddágilkora!
|
Geahča maid
-
Prarancangan Pabrik Etanolamin dari Etilen Oksida dan Amoniak Kapasitas 62.000 ton/tahun
Dahkki: Mahendra, Dimas Thaffif Rio, et al.
Almmustuhtton: (2017) -
Prarancangan Pabrik Etilen Karbonat dari Etilen Oksida dan Karbon Dioksida Kapasitas 30.000 Ton/Tahun
Dahkki: Huday, Sabiqul, et al.
Almmustuhtton: (2017) -
Prarancangan Pabrik Etilen Karbonat dari Etilen Oksida dan Karbon Dioksida Kapasitas 25.000 Ton/Tahun
Dahkki: Azzahra, Rikza Jihada, et al.
Almmustuhtton: (2017) -
PRARANCANGAN PABRIK ETILEN OKSIDA DARI ETILEN DENGAN PROSES OKSIDASI KAPASITAS 150.000 TON/TAHUN
Dahkki: Ismail, Andy, et al.
Almmustuhtton: (2016) -
Prarancangan Pabrik Fatty Alcohol Ethoxylate Dari Fatty Alcohol Dan Etilen Oksida Kapsitas 50.000 Ton/Tahun
Dahkki: Febriyanti, Suci Amalia, et al.
Almmustuhtton: (2016)