Perencanaan Ulang Jembatan Jurug Jln.Ir.Sutami Dengan Sistem Balok Prategang Mengacu Pembebanan RSNI T-02-2005
The purpose of final project is to know prestressed concrete bridge construction design rules which is right, so it needs calculation relats to the standard with bridge redesigning of Jln.Ir.Sutami, Solo, Central Java. The bridge is class 1 has span of 175 m with 4 girders spans on its pier. The rul...
Saved in:
Main Authors: | , |
---|---|
Format: | Book |
Published: |
2017-04.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Connect to this object online3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |