Perencanaan Ulang Jembatan Jurug Jln.Ir.Sutami Dengan Sistem Balok Prategang Mengacu Pembebanan RSNI T-02-2005
The purpose of final project is to know prestressed concrete bridge construction design rules which is right, so it needs calculation relats to the standard with bridge redesigning of Jln.Ir.Sutami, Solo, Central Java. The bridge is class 1 has span of 175 m with 4 girders spans on its pier. The rul...
Enregistré dans:
Auteurs principaux: | , |
---|---|
Format: | Livre |
Publié: |
2017-04.
|
Sujets: | |
Accès en ligne: | Connect to this object online |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Internet
Connect to this object online3rd Floor Main Library
Cote: |
A1234.567 |
---|---|
Exemplaire 1 | Disponible |