Laporan Tugas Prarancangan Pabrik Prarancangan Pabrik Asam Asetatdengan Proses Monsanto Kapasitas 100.000 Ton Per Tahun
Acetic acid plant with a designed production capacity of 100,000 tons per year with the raw material of methanol and carbon monoxide. The plant will be established in an industrial area Bontang, East Kalimantan, with a land area of 25,000 m2, and the number of employees 160 people. Factories operate...