Laporan Tugas Prarancangan Pabrik Prarancangan Pabrik Asam Asetatdengan Proses Monsanto Kapasitas 100.000 Ton Per Tahun

Acetic acid plant with a designed production capacity of 100,000 tons per year with the raw material of methanol and carbon monoxide. The plant will be established in an industrial area Bontang, East Kalimantan, with a land area of 25,000 m2, and the number of employees 160 people. Factories operate...

Full description

Saved in:
Bibliographic Details
Main Authors: Mardian Hastungkoro, Syifda Riyandi Wahyu (Author), , Hamid Abdillah, S.T., M.T (Author), , Emi Erawati, S.T,. M.Eng (Author)
Format: Book
Published: 2017-04-18.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Connect to this object online

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available