Prarancangan Pabrik Natrium Silikat Dari Natrium Oksida Dan Pasir Silika Kapasitas 75.000 ton Per Tahun
Sodium silicate factory with raw materials of sodium oxide and silica sand, the production capacity of 75,000 tons per year is planned to operate for 300 days per year. This factory will be established in the industrial park fire Tanjung Api, South Sumatra, with a land area of 45 160 m2 or 4.516 hec...
Saved in:
Main Authors: | , , |
---|---|
Format: | Book |
Published: |
2017-04-18.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Connect to this object online3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |