Prarancangan Pabrik Natrium Silikat Dari Natrium Oksida Dan Pasir Silika Kapasitas 75.000 ton Per Tahun
Sodium silicate factory with raw materials of sodium oxide and silica sand, the production capacity of 75,000 tons per year is planned to operate for 300 days per year. This factory will be established in the industrial park fire Tanjung Api, South Sumatra, with a land area of 45 160 m2 or 4.516 hec...
Saved in:
Main Authors: | Setiawan, Yudha Satria (Author), , Kusmiyati, S.T., M.T., Ph.D (Author), , Ir. Herry Purnama, M.T., Ph.D (Author) |
---|---|
Format: | Book |
Published: |
2017-04-18.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Prarancangan Pabrik Natrium Silikat Dari Natrium Oksida Dan Pasir Silika Kapasitas Produksi 70.000 Ton/Tahun
by: Surya Saputra, Arifin, et al.
Published: (2017) -
Prarancangan Pabrik Sodium Silikat Dari Natrium Hidroksida Dan Pasir Silika Kapasitas Produksi 60.000 Ton/Tahun
by: Trisnian, Nanda, et al.
Published: (2016) -
Prarancangan Pabrik Sodium SilikatDari Pasir Silika Dan Natrium Hidroksida Kapasitas 65.000 Ton Per Tahun
by: Zarmica, Ade Juli, et al.
Published: (2016) -
Prancangan Pabrik Asam Nitrat Dari Natrium Nitrat Dan Asam Sulfat Dengan Kapasitas 75.000 Ton Per Tahun
by: Cahyo, Okfin Yogo Nur, et al.
Published: (2014) -
Prarancangan Pabrik Asam Adipat Dari Sikloheksanon Dan Asam Nitrat Kapasitas 75.000 Ton/Tahun
by: Noviandini, Saskia, et al.
Published: (2016)