Prarancangan Pabrik Natrium Silikat Dari Natrium Oksida Dan Pasir Silika Kapasitas 75.000 ton Per Tahun
Sodium silicate factory with raw materials of sodium oxide and silica sand, the production capacity of 75,000 tons per year is planned to operate for 300 days per year. This factory will be established in the industrial park fire Tanjung Api, South Sumatra, with a land area of 45 160 m2 or 4.516 hec...
Bewaard in:
Hoofdauteurs: | , , |
---|---|
Formaat: | Boek |
Gepubliceerd in: |
2017-04-18.
|
Onderwerpen: | |
Online toegang: | Connect to this object online |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Wees de eerste die reageert!