Prarancangan Pabrik Etilen Karbonat dari Etilen Oksida dan Karbon Dioksida Kapasitas 25.000 Ton/Tahun
The ethylene carbonate (C3H4O3) plant with ethylene oxide and carbon dioxide feedstock with a capacity of 25.000 ton/year is planned to operate for 330 days per year and is planned to be established in 2020 in the Cilegon area of Banten. The process of preparing ethylene carbonate is carried out in...