Prarancangan Pabrik Etilen Karbonat dari Etilen Oksida dan Karbon Dioksida Kapasitas 25.000 Ton/Tahun
The ethylene carbonate (C3H4O3) plant with ethylene oxide and carbon dioxide feedstock with a capacity of 25.000 ton/year is planned to operate for 330 days per year and is planned to be established in 2020 in the Cilegon area of Banten. The process of preparing ethylene carbonate is carried out in...
Saved in:
Main Authors: | Azzahra, Rikza Jihada (Author), , Tri Widayatno,S.T., MS.c., Ph.D (Author), , Ir. Ahmad M.Fuadi, M.T., Ph.D (Author) |
---|---|
Format: | Book |
Published: |
2017.
|
Subjects: | |
Online Access: | Connect to this object online |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Prarancangan Pabrik Etilen Karbonat dari Etilen Oksida dan Karbon Dioksida Kapasitas 30.000 Ton/Tahun
by: Huday, Sabiqul, et al.
Published: (2017) -
Prarancangan PabrikEtilen Glikol Dari Etilen Oksida Dan Air Dengan Proses Hidrasi Non Katalitik Kapasitas 230.000 Ton/Tahun
by: Trisnani, Ika Anik, et al.
Published: (2015) -
Prarancangan Pabrik Etilen Glikol dari Etilen Oksida dan Air dengan Proses Hidrasi Non Katalitik Kapasitas 220.000 Ton/Tahun
by: Three Wiji Latifah, Ayu, et al.
Published: (2015) -
Prarancangan Pabrik Etilen Oksida Dari Etilen Dan UdaraKapasitas 55.000 Ton/Tahun
by: Tridayana, Asha
Published: (2012) -
Prarancangan Pabrik Etilen Oksida Dari Etilen Dan UdaraKapasitas 65.000 Ton/Tahun
by: Purnamitha, Nurul Widya Fitri
Published: (2012)