Prarancangan Pabrik Natrium Silikat Dari Natrium Oksida Dan Pasir Silika Kapasitas Produksi 70.000 Ton/Tahun

Sodium silicate factory with raw materials of sodium oxide and silica sand, the production capacity of 70,000 tons per year is planned to operate for 300 days per year. This factory will be established in the industrial park fire Tanjung Api, South Sumatra, with a land area of 45 160 m2 or 4.516 hec...

Full description

Saved in:
Bibliographic Details
Main Authors: Surya Saputra, Arifin (Author), , Kusmiyati, S.T, M.T, Ph.D (Author), , Ir. Herry Purnama, M.T., Ph.D (Author)
Format: Book
Published: 2017-07-31.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Connect to this object online

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available