OPTIMALISASI PENJADWALAN DAN PENGENDALIAN PROYEK SISTEM INFORMASI MENGGUNAKAN CRITICAL PATH METHOD (CPM) DAN EARNED VALUE ANALYSIS (EVA)

Planning and controlling costs and time are part of project management to ensure the project runs well. Scheduling requires Work Breakdown Structure and Network Diagrams, the more detailed the more accurate it will be. It is also necessary to identify the critical path using the Critical Path Method...

Full description

Saved in:
Bibliographic Details
Main Author: Aziz Hasan Nurrahman Alqowi, (Author)
Format: Book
Published: 2021-07-15.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Link Metadata

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available