ANALISIS NETWORK PLANNING REPARASI KAPAL FLAMINGO AWB 3377GT DENGAN METODE CRITICAL PATH METHOD
Network planning or also known as network planning is a model used in the implementation of ship repair projects. The network planning analysis method applied to the repair of the AWB Flamingo 3377 GT ship uses the CPM (Critical Path Method) method. The purpose of getting this is for network plannin...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2021-06-21.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |