PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ
To maintain a smooth production process, the need for maintenance functions on production machines must always be considered. The purpose of this study was to design a time schedule for inspection and preventive replacement of critical components on a transparent soap mixer machine with Reliability...
Saved in:
Main Author: | Farhan Febrian Putra, (Author) |
---|---|
Format: | Book |
Published: |
2021-12-13.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ
by: Leslie Shofira Wijaya,
Published: (2021) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ
by: Erika Rahmi,
Published: (2022) -
PENJADWALAN PERAWATAN PREVENTIVE MESIN SLOTTING DENGAN MENGGUNAKAN METODE AGE REPLACEMENT DI PT. XYZ
by: Edi Diantoro, -
Published: (2017) -
PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN BLISTERING LINE 3 DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PT. XY
by: Dyah Ayu Pitaloka,
Published: (2022) -
PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN VACUUM MIXER DENGAN PENERAPAN SIMULASI MONTE CARLO PADA PT. X
by: Muhammad Rizal,
Published: (2021)