OPTIMALISASI PROYEK PEMBANGUNAN LAPANGAN PENUMPUKAN EKS DELTA DI PELABUHAN TANJUNG PRIOK OLEH PT. ARYA PERMATA NUSA INDAH DENGAN MENGGUNAKAN METODE CPM, PERT DAN CRASHING

In a construction project there are three important aspects that must be considered, such as time, cost, and quality. Projects generally have a deadline, it means the projects must be completed before or on time so there are no delays. In this research, the case study used for the analysis of the ac...

Full description

Saved in:
Bibliographic Details
Main Author: Robi Anggara, (Author)
Format: Book
Published: 2022-06-22.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Link Metadata

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available