OPTIMALISASI PROYEK PEMBANGUNAN LAPANGAN PENUMPUKAN EKS DELTA DI PELABUHAN TANJUNG PRIOK OLEH PT. ARYA PERMATA NUSA INDAH DENGAN MENGGUNAKAN METODE CPM, PERT DAN CRASHING
In a construction project there are three important aspects that must be considered, such as time, cost, and quality. Projects generally have a deadline, it means the projects must be completed before or on time so there are no delays. In this research, the case study used for the analysis of the ac...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2022-06-22.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |