OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM, PERT, DAN CRASHING PROYEK LAPANGAN KONTAINER OLEH PT. SINAR CAKRA ABADI
Project planning requires supporting aspects so that errors do not occur such as increasing completion time. Delays occur from the influence of weather and workers' needs are not met. This research uses a container field project that takes 147 days. This project has a project time delay of 12 d...
Saved in:
Main Author: | Wendi Juliansyah, (Author) |
---|---|
Format: | Book |
Published: |
2022-06-22.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMALISASI WAKTU DAN BIAYA PROYEK MENGGUNAKAN METODE CPM, PERT, DAN CRASHING PADA PROYEK PEMBANGUNAN KANTOR KELURAHAN
by: Muhammad Sirozjudin Munir,
Published: (2022) -
OPTIMALISASI PROYEK PENINGKATAN KAPASITAS PELABUHAN BAKAUHEUNI DENGAN METODE CPM, PERT, DAN CRASHING OLEH PT. XYZ
by: Jeremia Radja Moza Malingkas,
Published: (2023) -
OPTIMALISASI PROYEK PEMBANGUNAN RUANG KELAS BARU DENGAN MENGGUNAKAN METODE CPM DAN PERT
by: Qhairun Hasan Al Mubarokah,
Published: (2020) -
OPTIMALISASI PROYEK PEMBANGUNAN LAPANGAN PENUMPUKAN EKS DELTA DI PELABUHAN TANJUNG PRIOK OLEH PT. ARYA PERMATA NUSA INDAH DENGAN MENGGUNAKAN METODE CPM, PERT DAN CRASHING
by: Robi Anggara,
Published: (2022) -
OPTIMASI WAKTU DAN BIAYA PADA PROYEK A DENGAN METODE CPM DAN PERT DI PT. XYZ
by: Reni Wulandari,
Published: (2020)