EVALUASI PENERAPAN JSA DAN HIRADC PENGGUNAAN TOWER CRANE PADA PROYEK JALAN TOL CINERE-JAGORAWI SEKSI 3 PT PP PRESISI TBK TAHUN 2022
JSA and HIRADC are some of many tools used for identification, analysis, and determining control of hazard risk at workplace that belonged to a risk control hierarchy, administration control. JSA and HIRADC could be implemented on construction sites, for example at tower crane operation at toll road...
I tiakina i:
Kaituhi matua: | Calviano Ramadhani Prakoso, (Author) |
---|---|
Hōputu: | Pukapuka |
I whakaputaina: |
2022-07-01.
|
Ngā marau: | |
Urunga tuihono: | Link Metadata |
Ngā Tūtohu: |
Tāpirihia he Tūtohu
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!
|
Ngā tūemi rite
-
FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN KINERJA PEKERJA PROYEK PEMBANGUNAN JALAN TOL CINERE - JAGORAWI SEKSI 3 PT. PP PRESISI TBK
mā: Aulia Salwadina,
I whakaputaina: (2023) -
HUBUNGAN FAKTOR PERSONAL DAN PEKERJAAN DENGAN PERILAKU BERBAHAYA PADA PEKERJA PROYEK TOL CINERE - JAGORAWI SEKSI 3 PT PP PRESISI TBK
mā: Andika Fajar Hidayatulloh,
I whakaputaina: (2023) -
ANALISIS FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN BURNOUT SYNDROME PADA PEKERJA PT PP PRESISI PROYEK TOL CINERE-JAGORAWI SEKSI 3 TAHUN 2023
mā: Maulana Hazim Almagribi,
I whakaputaina: (2023) -
IMPLEMENTASI GANTI RUGI DALAM PENGADAAN TANAH PEMBANGUNAN JALAN TOL CINERE-JAGORAWI SEKSI II
mā: Indira Aisha Pascal,
I whakaputaina: (2022) -
ANALISA RISIKO DENGAN METODE JOB SAFETY ANALYSIS (JSA) PADA PROSES PEKERJAAN BOX TUNNEL SEKSI II JALAN TOL CINERE JAGORAWI (Cijago) TAHUN 2016
mā: Dwi Arwandi Yogi Saputra, -
I whakaputaina: (2017)