EVALUASI PENERAPAN JSA DAN HIRADC PENGGUNAAN TOWER CRANE PADA PROYEK JALAN TOL CINERE-JAGORAWI SEKSI 3 PT PP PRESISI TBK TAHUN 2022
JSA and HIRADC are some of many tools used for identification, analysis, and determining control of hazard risk at workplace that belonged to a risk control hierarchy, administration control. JSA and HIRADC could be implemented on construction sites, for example at tower crane operation at toll road...
Saved in:
Main Author: | Calviano Ramadhani Prakoso, (Author) |
---|---|
Format: | Book |
Published: |
2022-07-01.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN KINERJA PEKERJA PROYEK PEMBANGUNAN JALAN TOL CINERE - JAGORAWI SEKSI 3 PT. PP PRESISI TBK
by: Aulia Salwadina,
Published: (2023) -
HUBUNGAN FAKTOR PERSONAL DAN PEKERJAAN DENGAN PERILAKU BERBAHAYA PADA PEKERJA PROYEK TOL CINERE - JAGORAWI SEKSI 3 PT PP PRESISI TBK
by: Andika Fajar Hidayatulloh,
Published: (2023) -
ANALISIS FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN BURNOUT SYNDROME PADA PEKERJA PT PP PRESISI PROYEK TOL CINERE-JAGORAWI SEKSI 3 TAHUN 2023
by: Maulana Hazim Almagribi,
Published: (2023) -
IMPLEMENTASI GANTI RUGI DALAM PENGADAAN TANAH PEMBANGUNAN JALAN TOL CINERE-JAGORAWI SEKSI II
by: Indira Aisha Pascal,
Published: (2022) -
ANALISA RISIKO DENGAN METODE JOB SAFETY ANALYSIS (JSA) PADA PROSES PEKERJAAN BOX TUNNEL SEKSI II JALAN TOL CINERE JAGORAWI (Cijago) TAHUN 2016
by: Dwi Arwandi Yogi Saputra, -
Published: (2017)