OPTIMALISASI PROYEK PENINGKATAN KAPASISTAS DERMAGA PELABUHAN MERAK DENGAN METODE CPM, PERT, DAN TIME COST TRADE OFF OLEH PT. XYZ

In a development, it is very necessary to plan and schedule in detail about; activities, time and cost required to complete a project. This is done to get optimal results, optimistic time, and efficient costs. In this study, the case study used for the analysis of project time acceleration is the pr...

Full description

Saved in:
Bibliographic Details
Main Author: Tika Syahdillah Daratu, (Author)
Format: Book
Published: 2022-06-27.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Link Metadata

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available