ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH PEGAWAI TIM PLTA X

PLTA X is a hydroelectric power plant located in North Sumatra. In carrying out its production process, PLTA X is experiencing problems, namely the optimal work pattern that has not been created, the high number of overtime, and the limited maintenance team, causing the maintenance process to requir...

Full description

Saved in:
Bibliographic Details
Main Author: Wahyu Maulana, (Author)
Format: Book
Published: 2022-12-07.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Link Metadata

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available