ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH PEGAWAI TIM PLTA X
PLTA X is a hydroelectric power plant located in North Sumatra. In carrying out its production process, PLTA X is experiencing problems, namely the optimal work pattern that has not been created, the high number of overtime, and the limited maintenance team, causing the maintenance process to requir...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2022-12-07.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |