ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH PEGAWAI TIM PLTA X
PLTA X is a hydroelectric power plant located in North Sumatra. In carrying out its production process, PLTA X is experiencing problems, namely the optimal work pattern that has not been created, the high number of overtime, and the limited maintenance team, causing the maintenance process to requir...
Saved in:
Main Author: | Wahyu Maulana, (Author) |
---|---|
Format: | Book |
Published: |
2022-12-07.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH TENAGA KERJA DIVISI SERVICE PT. XYZ
by: Teddy Rizki Saputra,
Published: (2023) -
Analisis Beban Kerja Menggunakan Metode Full Time Equivalent (FTE) Untuk Mengoptimalkan Kinerja Unit Produksi Di PT. X
by: Farah Fauzia Imron, Farah
Published: (2021) -
ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN TENAGA KERJA DI GROUP PENGADAAN PT XYZ
by: Salsa Febriyanti,
Published: (2023) -
IDENTIFIKASI BEBAN KERJA UNTUK MENENTUKAN JUMLAH TENAGA KERJA PROJECT MANAGEMENT OFFICE WILAYAH DISTRIBUSI 2 DI PT XYZ DENGAN MENGGUNAKAN METODE FTE (FULL TIME EQUIVALENT)
by: Nadira Chandra Reyhani,
Published: (2022) -
OPTIMALISASI WORKLOAD ANALYSIS DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENENTUKAN KEBUTUHAN TENAGA KERJA
by: Ibnu Maulana Ismail, -
Published: (2019)