PERANCANGAN MAINTENANCE MESIN HOIST TULANGAN DENGAN MENGGUNAKAN METODE LEAN MAINTENACE (STUDI KASUS: PT. XYZ)
PT. XYZ is a company engaged in manufacturing concrete. There are many machines that used in this company, one of them is the Reinforcement Hoist machine. The Reinforcement Hoist machine is the engine with the highest downtime on line 8 during 2019 with 90 hours.The maintenance system that applied i...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2020-06-25.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |