PERANCANGAN MAINTENANCE MESIN HOIST TULANGAN DENGAN MENGGUNAKAN METODE LEAN MAINTENACE (STUDI KASUS: PT. XYZ)

PT. XYZ is a company engaged in manufacturing concrete. There are many machines that used in this company, one of them is the Reinforcement Hoist machine. The Reinforcement Hoist machine is the engine with the highest downtime on line 8 during 2019 with 90 hours.The maintenance system that applied i...

Full description

Saved in:
Bibliographic Details
Main Author: Winan Azhari, (Author)
Format: Book
Published: 2020-06-25.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Link Metadata

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available