PERANCANGAN MAINTENANCE MESIN HOIST TULANGAN DENGAN MENGGUNAKAN METODE LEAN MAINTENACE (STUDI KASUS: PT. XYZ)
PT. XYZ is a company engaged in manufacturing concrete. There are many machines that used in this company, one of them is the Reinforcement Hoist machine. The Reinforcement Hoist machine is the engine with the highest downtime on line 8 during 2019 with 90 hours.The maintenance system that applied i...
Saved in:
Main Author: | Winan Azhari, (Author) |
---|---|
Format: | Book |
Published: |
2020-06-25.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Hoisting Appliances
by: International Correspondence Schools -
PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ
by: Erika Rahmi,
Published: (2022) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ
by: Leslie Shofira Wijaya,
Published: (2021) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ
by: Farhan Febrian Putra,
Published: (2021) -
PERANCANGAN PERAWATAN MESIN CTCM (CONTINUOUS TANDEM COLD MILL) PT. XYZ DENGAN METODE SIMULASI MONTE CARLO
by: Ahmad Tesa Karyadi,
Published: (2020)