ANALISIS PENGENDALIAN PERSEDIAAN MATERIAL ALAM MENGGUNAKAN METODE ALGORITMA WAGNER WITHIN DAN ALGORITMA SILVER MEAL PADA PT. X

PT. X is the largest precast concrete producer in Indonesia. According to the material fulfillment of JIS 2019 project, the company has inventory conditions that are often overstock and stockout, therefore its necessary to conduct an inventory control analysis to obtain an optimal planning and cost...

Full description

Saved in:
Bibliographic Details
Main Author: Rahmayanti Wulandari, (Author)
Format: Book
Published: 2020-06-23.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Link Metadata

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available