OPTIMALISASI PROYEK PEMBANGUNAN RUANG KELAS BARU DENGAN MENGGUNAKAN METODE CPM DAN PERT
In a construction project there are three important things that must be considered, such as time, cost, and quality. Projects generally have a deadline, it means that the project must be completed before specific time or the project will be delayed. In this research, the case study is project time a...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2020-06-25.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |