OPTIMALISASI PROYEK PEMBANGUNAN RUANG KELAS BARU DENGAN MENGGUNAKAN METODE CPM DAN PERT

In a construction project there are three important things that must be considered, such as time, cost, and quality. Projects generally have a deadline, it means that the project must be completed before specific time or the project will be delayed. In this research, the case study is project time a...

Full description

Saved in:
Bibliographic Details
Main Author: Qhairun Hasan Al Mubarokah, (Author)
Format: Book
Published: 2020-06-25.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Link Metadata

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available