OPTIMALISASI PROYEK PEMBANGUNAN RUANG KELAS BARU DENGAN MENGGUNAKAN METODE CPM DAN PERT
In a construction project there are three important things that must be considered, such as time, cost, and quality. Projects generally have a deadline, it means that the project must be completed before specific time or the project will be delayed. In this research, the case study is project time a...
Saved in:
Main Author: | Qhairun Hasan Al Mubarokah, (Author) |
---|---|
Format: | Book |
Published: |
2020-06-25.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMALISASI WAKTU DAN BIAYA PROYEK MENGGUNAKAN METODE CPM, PERT, DAN CRASHING PADA PROYEK PEMBANGUNAN KANTOR KELURAHAN
by: Muhammad Sirozjudin Munir,
Published: (2022) -
OPTIMALISASI PROYEK PENINGKATAN KAPASITAS PELABUHAN BAKAUHEUNI DENGAN METODE CPM, PERT, DAN CRASHING OLEH PT. XYZ
by: Jeremia Radja Moza Malingkas,
Published: (2023) -
OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM, PERT, DAN CRASHING PROYEK LAPANGAN KONTAINER OLEH PT. SINAR CAKRA ABADI
by: Wendi Juliansyah,
Published: (2022) -
OPTIMALISASI PROYEK PEMBANGUNAN LAPANGAN PENUMPUKAN EKS DELTA DI PELABUHAN TANJUNG PRIOK OLEH PT. ARYA PERMATA NUSA INDAH DENGAN MENGGUNAKAN METODE CPM, PERT DAN CRASHING
by: Robi Anggara,
Published: (2022) -
OPTIMALISASI PROYEK PENINGKATAN KAPASISTAS DERMAGA PELABUHAN MERAK DENGAN METODE CPM, PERT, DAN TIME COST TRADE OFF OLEH PT. XYZ
by: Tika Syahdillah Daratu,
Published: (2022)