E-Module of Cost Estimating Course in Building Construction Vocational Undergraduate Program Faculty of Engineering Universitas Negeri Jakarta

This R&D aims to develop e-modules based on blended learning in the cost esti-mating course. The research used the R&D method with the 4D (four-D) model carried out through four main stages, namely define, design, development, and dissemination. The e-module development was limited only to t...

Ful tanımlama

Kaydedildi:
Detaylı Bibliyografya
Asıl Yazarlar: Riyan Arthur (Yazar), Riza Nur Dwi (Yazar), Lenggogeni Lenggogeni (Yazar)
Materyal Türü: Kitap
Baskı/Yayın Bilgisi: Universitas Negeri Malang, 2021-08-01T00:00:00Z.
Konular:
Online Erişim:Connect to this object online.
Etiketler: Etiketle
Etiket eklenmemiş, İlk siz ekleyin!

Internet

Connect to this object online.

3rd Floor Main Library

Detaylı Erişim Bilgileri 3rd Floor Main Library
Yer Numarası: A1234.567
Kopya Bilgisi 1 Kütüphanede