E-Module of Cost Estimating Course in Building Construction Vocational Undergraduate Program Faculty of Engineering Universitas Negeri Jakarta

This R&D aims to develop e-modules based on blended learning in the cost esti-mating course. The research used the R&D method with the 4D (four-D) model carried out through four main stages, namely define, design, development, and dissemination. The e-module development was limited only to t...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Main Authors: Riyan Arthur (Author), Riza Nur Dwi (Author), Lenggogeni Lenggogeni (Author)
Format: Knjiga
Izdano: Universitas Negeri Malang, 2021-08-01T00:00:00Z.
Teme:
Online dostop:Connect to this object online.
Oznake: Označite
Brez oznak, prvi označite!

Internet

Connect to this object online.

3rd Floor Main Library

Podrobnosti zaloge 3rd Floor Main Library
Signatura: A1234.567
Kopija 1 Prosto