On site manufacturing (OSM) construction through lifting system for a modern high-rise building / Muhammad Fauzan Naim Murad and Mohd Rofdzi Abdullah
In line of high-rise construction there have several issues are state like timeframe of the development, the accident that occur throughout construction and weather that impact material handling from bottom to the highest of the building. This innovation is to enhancements within the construction of...
Wedi'i Gadw mewn:
Prif Awduron: | Murad, Muhammad Fauzan Naim (Awdur), Abdullah, Mohd Rofdzi (Awdur) |
---|---|
Fformat: | Llyfr |
Cyhoeddwyd: |
2019.
|
Pynciau: | |
Mynediad Ar-lein: | Link Metadata |
Tagiau: |
Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
|
Eitemau Tebyg
-
Development of integrated home security automation system / Muhammad Ruzaini Nordin and Mohd Rofdzi Abdullah
gan: Nordin, Muhammad Ruzaini, et al.
Cyhoeddwyd: (2019) -
Theory of combinatorial design for modular architecture / Salmiah Aziz, Azizah Md Ajis and Mohd Rofdzi Abdullah
gan: Aziz, Salmiah, et al.
Cyhoeddwyd: (2018) -
Modular construction system in Malaysia : issues for research in sustaining an affordable home project / Salmiah Aziz and Mohd Rofdzi Abdullah
gan: Salmiah, Aziz, et al.
Cyhoeddwyd: (2015) -
Overview of lean issues in managing the green construction project / Wan Nur Syazwani Wan Mohammad and Mohd Rofdzi Abdullah
gan: Wan Nur Syazwani, Wan Mohammad, et al.
Cyhoeddwyd: (2015) -
Building information modelling (BIM) adoption in contractor organisations / Wan Nur Syazwani Wan Mohammad, Mohd Rofdzi Abdullah and Sallehan Ismail
gan: Wan Mohammad, Wan Nur Syazwani, et al.
Cyhoeddwyd: (2018)