On site manufacturing (OSM) construction through lifting system for a modern high-rise building / Muhammad Fauzan Naim Murad and Mohd Rofdzi Abdullah
In line of high-rise construction there have several issues are state like timeframe of the development, the accident that occur throughout construction and weather that impact material handling from bottom to the highest of the building. This innovation is to enhancements within the construction of...
I tiakina i:
Ngā kaituhi matua: | Murad, Muhammad Fauzan Naim (Author), Abdullah, Mohd Rofdzi (Author) |
---|---|
Hōputu: | Pukapuka |
I whakaputaina: |
2019.
|
Ngā marau: | |
Urunga tuihono: | Link Metadata |
Ngā Tūtohu: |
Tāpirihia he Tūtohu
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!
|
Ngā tūemi rite
-
Development of integrated home security automation system / Muhammad Ruzaini Nordin and Mohd Rofdzi Abdullah
mā: Nordin, Muhammad Ruzaini, me ētahi atu.
I whakaputaina: (2019) -
Theory of combinatorial design for modular architecture / Salmiah Aziz, Azizah Md Ajis and Mohd Rofdzi Abdullah
mā: Aziz, Salmiah, me ētahi atu.
I whakaputaina: (2018) -
Modular construction system in Malaysia : issues for research in sustaining an affordable home project / Salmiah Aziz and Mohd Rofdzi Abdullah
mā: Salmiah, Aziz, me ētahi atu.
I whakaputaina: (2015) -
Overview of lean issues in managing the green construction project / Wan Nur Syazwani Wan Mohammad and Mohd Rofdzi Abdullah
mā: Wan Nur Syazwani, Wan Mohammad, me ētahi atu.
I whakaputaina: (2015) -
Building information modelling (BIM) adoption in contractor organisations / Wan Nur Syazwani Wan Mohammad, Mohd Rofdzi Abdullah and Sallehan Ismail
mā: Wan Mohammad, Wan Nur Syazwani, me ētahi atu.
I whakaputaina: (2018)