On site manufacturing (OSM) construction through lifting system for a modern high-rise building / Muhammad Fauzan Naim Murad and Mohd Rofdzi Abdullah
In line of high-rise construction there have several issues are state like timeframe of the development, the accident that occur throughout construction and weather that impact material handling from bottom to the highest of the building. This innovation is to enhancements within the construction of...
保存先:
主要な著者: | Murad, Muhammad Fauzan Naim (著者), Abdullah, Mohd Rofdzi (著者) |
---|---|
フォーマット: | 図書 |
出版事項: |
2019.
|
主題: | |
オンライン・アクセス: | Link Metadata |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Development of integrated home security automation system / Muhammad Ruzaini Nordin and Mohd Rofdzi Abdullah
著者:: Nordin, Muhammad Ruzaini, 等
出版事項: (2019) -
Theory of combinatorial design for modular architecture / Salmiah Aziz, Azizah Md Ajis and Mohd Rofdzi Abdullah
著者:: Aziz, Salmiah, 等
出版事項: (2018) -
Modular construction system in Malaysia : issues for research in sustaining an affordable home project / Salmiah Aziz and Mohd Rofdzi Abdullah
著者:: Salmiah, Aziz, 等
出版事項: (2015) -
Overview of lean issues in managing the green construction project / Wan Nur Syazwani Wan Mohammad and Mohd Rofdzi Abdullah
著者:: Wan Nur Syazwani, Wan Mohammad, 等
出版事項: (2015) -
Building information modelling (BIM) adoption in contractor organisations / Wan Nur Syazwani Wan Mohammad, Mohd Rofdzi Abdullah and Sallehan Ismail
著者:: Wan Mohammad, Wan Nur Syazwani, 等
出版事項: (2018)