Analysis of development planning of own use gas pipeline from gas compressor stations to gathering stations in X field / Muhammad Ariyon, Muhammad Setriya Ramadhan

Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B-GS.B5 has a total distance of 18 km. The distance of GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4-GS.B5 pipeline. The solution to this problem is to plan a pip...

詳細記述

保存先:
書誌詳細
主要な著者: Ariyon, Muhammad (著者), Ramadhan, Muhammad Setriya (著者)
フォーマット: 図書
出版事項: Universiti Teknologi MARA, Sarawak, 2023-03.
主題:
オンライン・アクセス:Link Metadata
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!