Time And Cost Controlling Using Critical Path Method (Case Study At Palur Fly-Over Surakarta)
ABSTRACT-The purpose of this study is to (1.To analyze the remaining work items at month of 14th from the project starts, 2). To analyze the remaining cost items at month of 14th after the project start. And the last is 3). To reschedule and to optimize the time and cost by use Critical Path Method...
Tallennettuna:
Päätekijät: | Elsosan, Adel Issa (Tekijä), , Mohammad Solikin, Ph.D (Tekijä), , Ir. M. Nur Sahid, M.T., M.M (Tekijä) |
---|---|
Aineistotyyppi: | Kirja |
Julkaistu: |
2015.
|
Aiheet: | |
Linkit: | Connect to this object online |
Tagit: |
Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!
|
Samankaltaisia teoksia
-
Analisis Nilai Waktu Pada Proses Pembangunan Pier Head Pilar Fly Over Palur Surakarta(Studi Kasus Jl.Raya Palur Surakarta)
Tekijä: Alghofili, Rinaldi Alfian, et al.
Julkaistu: (2015) -
Analysing Cost Implications Of Building Design Variables As Areas Of Modelling To Achieve Value For Money A Study on Selected Buildings in Surakarta and Surrounding Areas
Tekijä: Safiki, Ainomugisha, et al.
Julkaistu: (2016) -
Analisa Kelayakan Investasi Pembangunan Ruko Di Kota Surakarta
Tekijä: Prasetyo, Rahadian Adi, et al.
Julkaistu: (2013) -
Pengaruh Perbedaan Sumber Fly Ash Terhadap Karakteristik Mekanik High Volume Fly Ash Concrete
Tekijä: Kholishoh, Siti, et al.
Julkaistu: (2014) -
Analisa Investasi Dan Studi Kelayakan Proyek Pembangunan Perumahan Griya Asri Di Karanganyar
Tekijä: Martono, Apri Indra, et al.
Julkaistu: (2013)