Analisis Gangguan Hubung Singkat Pada Sistem Tenaga Listrik Di KSO Pertamina EP - GEO Cepu Indonesia Distrik 1 Kawengan Menggunakan Software ETAP 12.6
Study of short circuit is important in planning the manufacture of electric power systems. Short circuit occurs when the phase conductor is connected directly to the neutral conductor. Because no such resistance electrical appliancesvthus the short circuit current flow is proufoundly big. To mitigat...
Bewaard in:
Hoofdauteurs: | , |
---|---|
Formaat: | Boek |
Gepubliceerd in: |
2016-04-27.
|
Onderwerpen: | |
Online toegang: | Connect to this object online |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Internet
Connect to this object online3rd Floor Main Library
Plaatsingsnummer: |
A1234.567 |
---|---|
Kopie 1 | Beschikbaar |