Analisis Gangguan Hubung Singkat Pada Sistem Tenaga Listrik Di KSO Pertamina EP - GEO Cepu Indonesia Distrik 1 Kawengan Menggunakan Software ETAP 12.6

Study of short circuit is important in planning the manufacture of electric power systems. Short circuit occurs when the phase conductor is connected directly to the neutral conductor. Because no such resistance electrical appliancesvthus the short circuit current flow is proufoundly big. To mitigat...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Main Authors: Saputra, Very Bagus (Author), , Ir. Jatmiko, M.T (Author)
Formato: Livro
Publicado em: 2016-04-27.
Assuntos:
Acesso em linha:Connect to this object online
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!

Internet

Connect to this object online

3rd Floor Main Library

Detalhes do Exemplar 3rd Floor Main Library
Área/Cota: A1234.567
Cód. Barras: 1 Disponível