Prarancangan Pabrik Asam Sulfat dari Sulfur dan Udara Kapasitas 325.000 ton/tahun

Sulfuric acid plant raw material with sulfur and air capacity of 325,000 tons/year it is planned to operate for 330 days/year. Products of sulfuric acid (98%) produced as much as 41,035.3535 kg/hour of need as much sulfur raw materials 13,218.9274 kg\/h and air dry as much as 84,905.6490 kg/h. Suppo...

Full description

Saved in:
Bibliographic Details
Main Authors: Tria Okti Anggraini, Devi (Author), , Tri Widayatno, S. T., M. Sc., Ph. D. (Author), , Ir. Nur Hidayati, M.T., Ph.D (Author)
Format: Book
Published: 2016.
Subjects:
Online Access:Connect to this object online
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoums_44135
042 |a dc 
100 1 0 |a Tria Okti Anggraini, Devi  |e author 
700 1 0 |a , Tri Widayatno, S. T., M. Sc., Ph. D.  |e author 
700 1 0 |a , Ir. Nur Hidayati, M.T., Ph.D.  |e author 
245 0 0 |a Prarancangan Pabrik Asam Sulfat dari Sulfur dan Udara Kapasitas 325.000 ton/tahun 
260 |c 2016. 
500 |a https://eprints.ums.ac.id/44135/20/Naskah%20Publikasi.pdf 
500 |a https://eprints.ums.ac.id/44135/21/1.%20HALAMAN%20DEPAN.pdf 
500 |a https://eprints.ums.ac.id/44135/24/2._Bab_1.PDF 
500 |a https://eprints.ums.ac.id/44135/22/3._Bab%202.pdf 
500 |a https://eprints.ums.ac.id/44135/25/3._Bab%202.pdf 
500 |a https://eprints.ums.ac.id/44135/26/5._Bab_4.PDF 
500 |a https://eprints.ums.ac.id/44135/27/6._Bab_5.PDF 
500 |a https://eprints.ums.ac.id/44135/28/7._Bab_6.PDF 
500 |a https://eprints.ums.ac.id/44135/29/8._BAB_7.PDF 
500 |a https://eprints.ums.ac.id/44135/30/9._DAFTAR_PUSTAKA.PDF 
500 |a https://eprints.ums.ac.id/44135/23/Lampiran.pdf 
500 |a https://eprints.ums.ac.id/44135/31/13_.SURAT_PERNYATAAN_KEASLIAN_SKRIPSI.PDF 
520 |a Sulfuric acid plant raw material with sulfur and air capacity of 325,000 tons/year it is planned to operate for 330 days/year. Products of sulfuric acid (98%) produced as much as 41,035.3535 kg/hour of need as much sulfur raw materials 13,218.9274 kg\/h and air dry as much as 84,905.6490 kg/h. Supporting utilities water supply include process amounted to 767,024.80 kg\/h, the electric needs of 650.157 kW obtained from the State electricity company (PLN) and supplied generator set as a backup. The planned factory is established in Banyuwangi, East Java by 2020 with a land area of 10,492 m2 and require employees of 282 people. Using sulfuric acid factory fixed capital is Rp. 700,551,445,143.45 and working capital amounting to Rp. 135,930,726,589. Economic analysis of the results against the factory obtained results Percent Return on Investment before tax amounting to 32.8% and after tax of 26.3%. Pay Out Time before tax amounted to 2.34 years and after of 2.76 years. Break Even Point (BEP) of 44,62%, Shut Down Point (SDP) by 21% and the Discounted Cash Flow (DCF) for 39,28 percent. From the above data then it can be inferred that the factory is profitable and viable. Keywords : sulphuric acid, kontak process, fixed bed 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
546 |a en 
690 |a TS Manufactures 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n https://eprints.ums.ac.id/44135/ 
787 0 |n D500110004 
856 \ \ |u https://eprints.ums.ac.id/44135/  |z Connect to this object online