Perencanaan Ulang Jembatan Jurug Jln.Ir.Sutami Dengan Sistem Balok Prategang Mengacu Pembebanan RSNI T-02-2005
The purpose of final project is to know prestressed concrete bridge construction design rules which is right, so it needs calculation relats to the standard with bridge redesigning of Jln.Ir.Sutami, Solo, Central Java. The bridge is class 1 has span of 175 m with 4 girders spans on its pier. The rul...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Buch |
Veröffentlicht: |
2017-04.
|
Schlagworte: | |
Online-Zugang: | Connect to this object online |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Online
Connect to this object online3rd Floor Main Library
Signatur: |
A1234.567 |
---|---|
Exemplar 1 | Verfügbar |